Interestingly, this message has been received from a Pakistani in Sri Lanka :
Read & Think about yourself Electricity produced in Pakistan is from three main sources.
1). Hydal 2). Thermal (Gas/Steam/Furnace Oil) 3). Nuclear
There are four major power producers in country which include Water & Power Development Authority (WAPDA), Karachi Electric Supply Company (KESC), Independent Power Producers (IPPs) and Pakistan Atomic Energy Commission (PAEC).
Below is the break-up of the installed capacity of each of these power producers (as of June-2008).
1). WAPDA
a). WAPDA Hydal
Terbela 3478 MW Mangla 1000 MW
Ghazi-Brotha 1450 MW Warsak 243 MW Chashma 184 MW Dargai 20 MW Rasul 22 MW Shadi-Waal 18 MW NandiPur 14 MW Kurram Garhi 4 MW Renala 1 MW Chitral 1 MW Jagran (AK) 30 MW Total hydal ==> 6461 MW
b). WAPDA Thermal Gas Turbine Power Station, Shadra 59 MW Steam Power Station, Faisalabad 132 MW Gas Turbine Power Station, Faisalabad 244 MW Gas Power Station, Multan 195 MW Thermal Power Station, Muzaffargarh 1350 MW Thermal Power Station, Guddu 1655 MW Gas Turbine Power Station, Kotri 174 MW Thermal Power Station, Jamshoro 850 MW Thermal Power Station, Larkana 150 MW Thermal Power Station, Quetta 35 MW Gas Turbine Power Station, Panjgur 39 MW Thermal Power Station, Pasni 17 MW Total Thermal ==> 4811 MW
WAPDA's Total Hydal + Thermal capacity is 11272 MW.
2). Karachi Electric Supply Company Thermal Power Station, Korengi 316 MW Gas Turbine Power Station, Korengi 80 MW Gas Turbine Power Station, SITE 100 MW Thermal Power Station, Bin Qasim 1260 MW
Total (KESC) ==> 1756 MW
3). Independent Power Producers (IPPs) Hub Power Project 1292 MW AES Lalpir Ltd, Mahmood Kot MuzaffarGarh 362 MW AES Pak Gen, Mahmood Kot MuzaffarGarh 365 MW Altern Energy Ltd, Attock 29 MW Fauji KabirWala Power Company, Khanewal 157 MW Gul Ahmad Energy Ltd, Korengi 136 MW Habibullah Coastal Power Ltd 140 MW Japan Power Generation, Lahore 120 MW Koh-e-Noor Energy Ltd, Lahore 131 MW Liberty Power Limited, Ghotki 232 MW Rousch Power, Khaniwal 412 MW Saba Power Company, Sheikhpura 114 MW Southern Electric Power Company Ltd, Raiwind 135 MW Tapal Energy Limited, Karachi 126 MW Uch Power Ltd, Dera Murad Jamali, Nasirabad 586 MW Attock Gen Ltd, Morgah Rawalpindi 165 MW Atlas Power, Sheikhpura 225 MW Engro Energy Ltd, Karachi ----- MW Kot Addu Power Company Limited (Privitized) 1638 MW
Total (IPPs) ===> 6365 MW
4). Pakistan Atomic Energy Commission KANUPP 137 MW CHASNUPP-1 325 MW Total (Nuclear) ===> 462 MW
Hydal Electricity generated by WAPDA varies between two extremities i.e. bewteen minimum of 2414 MW and maximum of 6761 MW depending upon the river flow through the whole year.
Total Power Generation Capacity of Pakistan (including all sources) is 19855 MW and the electricity demand (as of today 20-04-2010) is 14500 MW and PEPCO is merely generating 10000 MW.
So it is obvious that these 15-20 hrs power shutdowns in most parts of the country are not because of the lack of generation capacity but only because of IMF / World bank policies imposed on our corrupt leader. The Power Generation companies are not buying Furnace Oil from PSO by saying they dont have money to do that but we are all paying for Electricity that is generated from Furnace Oil. This is the reason that top refineires like PRL are operating at 40% capacities. IMF / World bank has imposed to reduece budget deficit by importing less crude oil. But due to this fact all our industries are under severe crisis. None of our political party who are in Assembly are ready to speak on it because every one is blessed by US / IMF / WORLD Bank whether it PPP, PML , MQM , ANP or JUI
Things in Pakistan can change but they will change only once we have Govt which does not work on action of US.
|