What else can be termed as corruption. Every where in the
world the cost per Mega Watt for power projects based on oil is
considered as 1 million dollars ( comprising of latest European or
American Equipment) where as these frauds are evaluating the cost of project
for 1.70 million dollars and that also for coal based project consisting
of Chinese Equipment which has no match in terms of
performance with equipment from west. As per Nepra's established
estimates, the cost of Coal based
power plant amounts to $ 0.55 Million Dollar per Mega Watt ( this amount
may vary by 20 , 25% or even 100 % because
of inflation but can never touch a figure of 1.70 million/
MW, unbelievable ) ,this includes 17 % contractors
profit, now unprecedented contractors profit i.e 27 % is
being allowed on total invested amount of project. Plus the government
would pay an interest @ of 7 % to the Chines government on amount of Loan
to be availed. What a drama .
It is also apprehended that used/ obsolete
equipment would be allowed to be imported for these projects.
PML- N for the sake of their commission is
pushing the country toward disaster. However, If at all government is
sincere in its efforts, then MOU and other details signed between the
governments be made public to remove ambiguities. Pl.
have a mercy on the poor Pakistanis.
Durrani.
|